vertical indicator UL ULC FM

Installation instructions:
1.Unload the upper cover of control lead
2.Measure control lead depth,remove the excess part of connector lead and driving rod
3.Fit the control rod with full closed valve,turn the position plate to shut position
4.load upper cover

分类:
Spread the love

描述

ZSQ vertical type indicator post UL ULC listed FM approved

Installation instructions:
1.Unload the upper cover of control lead
2.Measure control lead depth,remove the excess part of connector lead and driving rod
3.Fit the control rod with full closed valve,turn the position plate to shut position
4.load upper cover

ZSQ vertical indicator post UL ULC listed FM approved

ZSQ vertical indicator post UL ULC listed FM approved